PadmountGear Request a unit

Transformers for EV-charging sites and depots

Fast-charging hubs and fleet depots often need a dedicated transformer, and the size depends on how many chargers you install, their ratings, how they share load, and your plans to grow. Your designer works that out with the DNSP.

When the chargers are ready but the transformer isn't, a listed or sourced unit can get the site energised sooner.

What to check

  • Maximum demand with load management

  • Room for future chargers

  • Harmonics from charger electronics

  • DNSP acceptance

  • Footprint on site

FAQ

What size do I need for my chargers?

Your designer sizes it from charger count, ratings and load management.

Can I start smaller and upgrade?

Possible, but plan the footprint and cabling for the final size.

Do you work with depot operators directly?

Yes, as well as their contractors.

Matching listings

No EV-charging units listed right now. Request one.

Waiting on a unit? Request a unitSitting on one? List your gear